11.19.07
W shape base
Guys,
I have revised the base using W shaped beams and L’s. This base is stronger than needed for machine operation due to transport and erection needs. In order to be able to crane this thing into place as a unit it has to be pretty stiff or we will end up damaging the main tube above (for the most part the thin skin on the outside of the tube would buckle). About half of the “X” bracing could be removed after the machine is in place. This would allow for greater access by service personnel. The wrap for the base will be in 12 foot sections. I think we can ship it with all but 4 of the sections on the base. This configuration weighs about 15,000#.